Network Rail will repair a track fault near Wivelsfield overnight. Until then, trains towards Brighton may be delayed by up to 15 minutes, National Rail says.

Network Rail has found a fault on the southbound line between Haywards Heath and Wivelsfield and will repair it overnight, National Rail and Southern say. Until then, trains towards Brighton run at reduced speed.

  • What: Trains towards Brighton “may be delayed by up to 15 minutes or revised”.
  • Where: Haywards Heath to Wivelsfield, towards Brighton, on Southern, Thameslink and Gatwick Express.
  • When: Reported at 2.21pm. Disruption is expected until the end of the day.

What National Rail and Southern said

National Rail and the Southern service updates page both say: “Network Rail have inspected the track between Haywards Heath and Wivelsfield, and identified a fault with the Southbound line. Repairs will be carried out overnight to prevent further disruption to the network.”

They add: “Trains may come to a brief a stop in the Haywards Heath area, whilst the driver liaises with the signaller.”

What it means for you

  • Travelling from London or Gatwick Airport towards Brighton and the South Coast, Southern says “you should allow an extra 15 minutes to complete your journey”.
  • Gatwick Express trains from London Victoria run only as far as Gatwick Airport or Haywards Heath. For Brighton, Southern says “please use alternative Thameslink services”.
  • Late Southern and Thameslink trains “may skip some stops or terminate part of the way along their usual route”.
  • If your train is cancelled, National Rail says you can use another participating train company’s service up to two hours before or after its original departure time.

Source: National Rail live travel information and Southern service updates. Last checked at 5.40pm on Wednesday 18 November. We will update this story when National Rail, Network Rail or the train operators say more.